The installation process for solar panels typically takes between one to three days once the paperwork and necessary inspections are finished. However, the entire process from start to finish, including obtaining permits, can take anywhere from one to three months. The timeline can vary based on your installation company, the complexity of your system, and how much preparation your home needs.

General Timeline for Solar Panel Installation

Solar panel installation is a process that requires careful planning, preparation, and several steps.

Choosing a Solar Installer

Before anything else, you’ll need to hire a solar installer to conduct the project. This alone can take several weeks and involves initial consultations, comparing quotes, and making a decision. The diligence you put in at this stage can pay off in the long run.

Performing a Site Assessment

Once you’ve selected an installer, they will visit your home to perform a site assessment. This assessment helps to determine the best placement for your solar panel system and identify any potential challenges that may affect installation. This step usually takes around 1-2 weeks.

Designing the Solar System

After the assessment, the installer designs a solar panel system customized for your home. This includes determining the best type and location of solar panels. On average, this design process takes about 1-2 weeks.

Applying for the Necessary Building and Solar Permits

Applying for the Necessary Building and Solar Permits

Your installer will also help you apply for permits from your local authority. The time it takes to obtain permits varies widely, it could be as quick as 2 weeks or drag on for 2 months.

Ordering the Equipment and Scheduling the Installation

The installer orders the necessary equipment based on the finalized design. This phase might take another 1-3 weeks. Simultaneously, your installation date is scheduled, which could be immediate or several weeks out, depending on the company’s backlog.

The Physical Installation Process

The actual installation process, where your solar panels are physically mounted on your roof, typically takes anywhere from 1-3 days.

Scheduling and Completing the City Inspection

After installation, your city will need to inspect the setup to ensure it meets all codes and regulations. This post-installation inspection typically occurs within a week.

Securing Utility Interconnection and Permission to Operate

Following a successful inspection, you’ll need to connect your solar system to your utility’s electric grid, a process known as interconnection. Once your utility gives the OK—usually within 1-2 weeks—you can switch your solar panel system on and start generating your own solar power.

Specific Installation Scenarios

Specific Installation Scenarios

How Long to Install Solar Panels on a House

The time it takes to install solar panels on a house largely depends on your home’s size and the number of panels you’re installing. However, for most residential properties, the actual installation can be completed within 1-3 days, as mentioned above.

How Long Does it Take to Install 20 Solar Panels

Installing 20 solar panels may require around two days. A skilled installation team can typically install around 10-12 panels a day. However, this time may extend due to unexpected hurdles, or if you have a more complex roof structure.

Factors Affecting the Installation Timeline

Your installation timeline can be impacted by several factors.

HOA Approval

If your homeowner’s association (HOA) has to review and approve your solar project, this can extend your preparation time. It’s best to anticipate and submit your proposal early.

Main Panel Upgrade

Main Panel Upgrade

In some cases, your home’s electrical panel may need an upgrade to handle the extra load from your solar panels. This can add a few extra days onto your project timeline.

Roof Repair

If your roof isn’t in good condition, it might need repairs or replacement before installing solar panels. This can add weeks to your project timeline.

Unpermitted Structures and Service Panel

If you have unpermitted structures or a complicated service panel setup on your property, it may take longer to secure the necessary permits.

Solar Equipment Availability

Rarely, there may be a delay in securing the materials necessary. This could push back your installation date and subsequently increase the installation time.

Ending Note: The Worth of Patience in Solar Installation

In all, the process of solar installation isn’t instantaneous—yet it’s worth the wait. Every day brings you closer to generating your own electricity, reducing your utility bills, and helping the environment.

If you’re interested in the specific steps to installing solar panels, have a read of our in-depth guide, “How to Install Solar Panels”.

This comprehensive article has discussed “how long does it take to install solar panels”. But remember, timeframes can vary based on a variety of factors. Careful planning can ensure a smooth, timely installation process, so take advantage of our wealth of advice and get your solar project off to a great start.

Photo of author
Author
Elliot has 20+ years of experience in renewable technology, from conservation to efficient living. His passion is to help others achieve independent off-grid living.

SolVoltaics is an affiliate and an Amazon Associate, we earn from qualifying purchases - at no extra cost to you.

1 thought on “How Long Does it Take to Install Solar Panels? A Complete Guide”

Comments are closed.

FIND WHAT YOU'RE LOOKING FOR